NIS2 for water utilities · cybersecurity in the water sector

NIS2 for water utilities.
Continuity of water supply is now also a cybersecurity issue.

Drinking water supply and wastewater collection are sectors of high criticality under the Polish act implementing NIS2. Therefore, a water and wastewater company must determine its classification, apply for entry in the register and then implement an ISMS that also covers SCADA and telemetry. Because BCMLogic Next brings these obligations together in one GRC system, each of them has an owner, a deadline and evidence for the audit.

NIS2 at a glance · water utilitiesEU-wide rules
Incident reporting
early warning · notification · final report

24 h · 72 h · 1 mo

Max. fine – essential entity
whichever is higher

€10m / 2%

Max. fine – important entity
whichever is higher

€7m / 1.4%

Accountability
approval, oversight, training

Management body

Registration and implementation deadlines are set by each EU member state in its national law.

What is changing

NIS2 for water utilities: three changes to put into practice

The Polish NIS2 act brings water and wastewater companies under the full set of obligations. As a result, self-assessment, management board accountability and IT, OT and supplier risk become a single, continuously maintained process.

Change 1

You determine your status – and you register yourself

The company assesses for itself whether it is an essential or an important entity, and then applies for entry in the register in the S46 system. Above all, company size is decisive, although in some cases designation as a critical entity also matters.

⚠ Deadlines set by national law
Change 2

The management board is accountable, not just IT

The management board approves risk management measures, oversees their implementation and, in addition, completes training every year. Consequently, negligence can lead to a personal fine – even if no incident has occurred.

✓ Personal liability
Change 3

The ISMS also covers SCADA, telemetry and suppliers

The information security management system must cover the control of water treatment plants, wastewater treatment plants and pumping stations. Furthermore, it covers network telemetry as well as integrators and maintenance providers with remote access.

✓ IT + OT + supply chain
Scale of liability

A fine is one risk, whereas an interruption in water supply is another.

10 million EUR
or 2% of annual turnover, i.e. the maximum fine for an essential entity.
7 million EUR
or 1.4% of annual turnover, i.e. the maximum fine for an important entity.
300%
of remuneration, i.e. the personal fine for the head of the entity (in public entities, however, up to 100%).
24 h / 72 h
early warning and notification of a significant incident, followed by a final report within one month.

A fine does not require an incident. This is because penalties may result simply from failing to meet obligations, for example not registering, not carrying out a risk assessment, not reporting or not completing an audit. Details in the FAQ.

Classification

Is your water utility covered by NIS2?

Choose the option closest to your organisation. However, this is only a quick indication, so for a full answer use the NIS2 Qualifier, which also takes into account turnover, balance sheet total and ownership links.

Indicative result

As a rule, outside the scope of NIS2

Micro and small water utilities are, as a rule, neither essential nor important entities. However, there are exceptions, so it is worth checking them.

What this means in practice

  • First of all, designation as a critical entity (CER Directive) means essential entity status regardless of size.
  • In addition, if you provide services to an essential entity, you may be subject to its supply chain requirements.
  • On the other hand, water services run within a municipal office are assessed together with the whole unit.
Indicative result

Important entity

A medium-sized water and wastewater company, which is the most common case in cities and counties, is an important entity.

What this means in practice

  • First, an application for entry in the S46 register and the appointment of a cybersecurity contact person.
  • Next, an ISMS with a risk assessment covering IT and OT, implemented within the national deadline.
  • In addition, incident reporting within 24 h / 72 h / 1 month, as well as board oversight and training.
  • The fine is up to EUR 7 million or 1.4% of turnover, while supervision by the authority is ex post, i.e. after an event.
Indicative result

Essential entity

A large water company, for example in a metropolitan area, is an essential entity and therefore has the full set of obligations, including an audit.

What this means in practice

  • All the obligations of an important entity and, furthermore, regular security audits as required by national law.
  • Supervision is also ex ante, which means an inspection can take place without a prior incident.
  • As a result, the fine can reach EUR 10 million or 2% of turnover.
Indicative result

Essential entity – regardless of size

If the company has been designated as a critical entity under the CER Directive, it is an essential entity under NIS2 regardless of headcount.

What this means in practice

  • Consequently, the full set of essential entity obligations applies, including the audit.
  • Moreover, resilience and critical service continuity requirements are added, so it makes sense to manage them in one system together with NIS2.
Indicative result

Assessed as part of the local government unit

When a municipality runs water services directly, for example as a budgetary establishment or a department in the municipal office, classification applies to the whole unit rather than just the water service.

What this means in practice

  • However, separate rules and thresholds apply to local government units, so their status must be determined individually.
  • By contrast, a municipal company is assessed like any business, i.e. according to its size.

Size thresholds follow the SME rules, i.e. they are based on headcount and turnover or balance sheet total. Check your status in the NIS2 Qualifier →

NIS2 timeline

NIS2 timeline – EU milestones and national deadlines

NIS2 is an EU directive, so each member state transposes it into its own law. Therefore, the EU dates below are common to everyone, whereas registration and implementation deadlines depend on your country.

16 Jan 2023

NIS2 enters into force

Directive (EU) 2022/2555 replaces the original NIS Directive and sets common rules for the whole EU.

17 Oct 2024

Transposition deadline

Member states had to adopt national laws implementing NIS2 and apply them from 18 October 2024.

17 Apr 2025

Lists of entities

Member states had to establish lists of essential and important entities, which register with national authorities.

National

Your national deadlines

Registration, implementation and audit deadlines differ by member state. Therefore, check them with your national competent authority.

Five areas to implement and maintain

1

Classification and registration

First, determining your status, then applying for entry in the S46 register and appointing a contact person.

2

IT and OT risk assessment

Risks for water treatment plants, wastewater treatment, telemetry, GIS and billing, as well as their owners and actions.

3

Continuity of water supply

BIA and continuity plans, including, for example, switching to manual control after losing SCADA.

4

Incidents and supply chain

Incident reporting and, furthermore, assessment of OT integrators, SCADA vendors and maintenance providers.

5

Board oversight and audit

Approvals and annual board training, so that evidence is ready for the audit.

Legal basis: Directive (EU) 2022/2555 (NIS2). The “Drinking water” and “Waste water” sectors are listed in Annex I, i.e. sectors of high criticality. Classification depends on company size and on the national law of the member state where you operate.
Sector specifics

A water utility is not an ordinary IT environment

In water utilities, a cyber incident can stop a physical process, for example water treatment, pumping or wastewater treatment. That is why risk assessment and continuity plans must cover the entire infrastructure – from SCADA to billing.

The areas switch automatically. Click to stay on the one you choose.

Water treatment plants

SCADA and water treatment process automation

PLCs, HMIs and SCADA servers control pumps, filters and chemical dosing. Therefore, an unauthorised change of parameters is a risk to water quality and also to consumers’ health.

Business continuity plan scenario
Loss of access to the treatment plant SCADA
In BCMLogic Next: A procedure for switching to manual control, as well as a list of critical setpoints, the integrator’s contact details and recovery time.
Wastewater treatment

Treatment processes and discharge to the receiving water

A failure or attack on the control of biological and chemical processes can end with untreated wastewater being discharged. As a result, the incident becomes an environmental one, not just an IT one.

Business continuity plan scenario
Loss of process control
In BCMLogic Next: Emergency mode and recovery priorities, as well as communication with environmental authorities and evidence of actions taken.
Network and telemetry

Pumping stations, flow and pressure measurements

Telemetry gives a real-time picture of the network, for example leaks, failures and pressure. However, distributed sites with remote connectivity also mean a distributed attack surface.

Business continuity plan scenario
Loss of visibility into the network
In BCMLogic Next: Manual readings and site visits, as well as site priorities and dependence on the connectivity provider.
GIS and records

Map of underground infrastructure

GIS and network records are needed for every failure and investment. Consequently, their unavailability lengthens fault repairs and repair planning.

Business continuity plan scenario
GIS unavailable during a failure
In BCMLogic Next: Offline copies of key maps and, in addition, a system owner and a recovery time from backup.
Billing and customer service

CRM, invoicing, payments

This is the most common ransomware target because it holds customer data, bank integrations and invoicing. An incident may therefore require reporting both to the CSIRT and to the data protection authority (UODO).

Business continuity plan scenario
Ransomware in office systems
In BCMLogic Next: Isolated backups, parallel reporting deadlines (NIS2 and GDPR), as well as customer communication.
OT suppliers and integrators

Maintenance, remote access, SCADA software

Integrators and maintenance providers often have remote access to control systems. The Act, in turn, requires supply chain risk assessment, and in water utilities this applies above all to OT suppliers.

Business continuity plan scenario
Compromise of a supplier with remote access
In BCMLogic Next: An access register and contractual requirements, as well as reviews and quick revocation of permissions.
What this means in practice: A water utility’s ISMS covers an inventory of OT assets and segmentation of IT and OT networks, as well as traffic monitoring, rules for updating controllers and a plan for losing SCADA. It is also good practice to follow the IEC 62443 series of standards.
BCMLogic Next for water utilities

A GRC system for water utilities that keeps NIS2 compliance alive every day

BCMLogic Next connects risks, BIA, continuity plans, incidents, suppliers and deadlines. As a result, security, IT, the technical department and the board work on one up-to-date dependency model instead of spreadsheets sent by email.

Already have documentation? We move it into the system. Starting from scratch? Wizards guide you through.
We will migrate your existing risk assessment, procedures or continuity plans to BCMLogic Next – we can do it, your team can, or the partner who prepared them. You can also build documentation from scratch, step by step in the application.

IT and OT risk assessment

Risks for water treatment, wastewater, telemetry and billing in one register, as well as their owners, ratings, actions and change history.

Step-by-step wizard

Policies and procedures

Policy templates and board approval workflows, so you have versions and proof of adoption.

Ready-made templates

Continuity of water supply

BIA, BCP and DRP with dependencies on sites, utilities, people and suppliers. In addition, SCADA loss scenarios and tests with exercise history.

OT/SCADA scenarios

Incidents under NIS2

Incident classification and 24 h / 72 h / 1 month deadlines, as well as an action log and notification content to transfer into S46.

24 h / 72 h timer

OT suppliers and integrators

A register of SCADA vendors, integrators and maintenance providers, together with risk assessment and links to processes.

OT supplier register

Audit readiness

Status of obligations and a history of approvals, reviews and tests, i.e. evidence in one place.

Report for the auditor
BCMLogic Next Lite · water utilities package

A smaller water company? Start with the Lite version

Next Lite is a configuration of the BCMLogic Next platform designed for the Polish NIS2 act, i.e. only what the Act requires. Therefore, it leaves out complex processes that a medium-sized water company does not need. When your organisation grows, however, you move to the full version without migrating data.

  • “Water and wastewater” industry package
    Ready-made risk templates for water supply continuity and control systems (OT), so you do not start with an empty table.
  • NIS2 classifier
    Questions tailored to your sector determine whether you are an essential or important entity, and then build a plan with deadlines.
  • Policies, incidents, ICT suppliers
    Policy templates with board approval, as well as incidents with 24 h / 72 h / 1 month deadlines and supplier assessment.
  • No user limit
    You pay a fixed monthly fee, so there is no limit on users, risks or suppliers.
BCMLogic Next LiteRisk assessment with an industry package
from €150
net per month, pre-sale price for orders placed by 31 Dec 2026 (price fixed for 2027)
30 days
free of charge on your organisation’s data. SaaS service with ISO/IEC 27001
Online demo

Want to see how it works in practice?

Explore BCMLogic Next with demo data or book a 30-minute meeting. Then we will walk you through a water utility scenario, i.e. OT risk, supply continuity, an incident and audit preparation.

Online demo environment
Ready-made demo data, i.e. risks, BIA, incidents, continuity plans and NIS2 compliance.

A short meeting with our team
30 minutes for a system walkthrough, as well as questions about your water utility and where you are in your NIS2 preparations.

Request demo access or book a 30-minute meeting →

FAQ · NIS2 for water utilities

Frequently asked questions about NIS2 for water utilities

Above all, company classification and SCADA in the ISMS, as well as deadlines, fines, incidents and choosing a system.

Is a water utility subject to NIS2?

Yes, in most cases, because drinking water supply and wastewater collection are sectors of high criticality listed in Annex 1 to the Polish NIS2 act. Medium-sized companies (from 50 employees or above the financial thresholds) are therefore important entities, whereas large ones (from 250 employees or above the financial thresholds) are essential entities. Micro and small companies, on the other hand, are as a rule outside the Act, although with exceptions.

Is our water utility an essential or an important entity?

Above all, company size determined under the SME rules is decisive, i.e. headcount and turnover or balance sheet total. In addition, regardless of size, a company designated as a critical entity under the CER Directive is an essential entity. That is why it is worth confirming your status in the NIS2 Qualifier.

Is a municipality that runs its own water services subject to NIS2?

It depends on the legal form. A municipal company is assessed like any business, i.e. according to its size. If, however, the municipality runs water services directly, for example as a budgetary establishment or a department in the municipal office, classification applies to the whole local government unit, which is subject to separate rules. Therefore, such a case requires individual analysis.

Do SCADA systems have to be covered by the ISMS?

Yes, because control systems for water treatment plants, wastewater treatment plants and pumping stations are part of the information system on which the service depends. Therefore, the ISMS should cover their inventory and the segmentation of IT and OT networks, as well as monitoring, rules for updating controllers and an action plan in case SCADA is lost.

What NIS2 deadlines apply to water utilities?

Deadlines depend on the member state, because each country transposes NIS2 into its own law. At EU level, member states had to apply their national rules from 18 October 2024 and establish lists of essential and important entities by 17 April 2025. Therefore, check registration and implementation deadlines with your national competent authority.

What fines can a water utility face?

An essential entity faces a fine of up to EUR 10 million or 2% of annual turnover, whereas an important entity faces up to EUR 7 million or 1.4%. In addition, the head of the entity faces a personal fine of up to 300% of remuneration (up to 100% in public entities). Moreover, a penalty does not require an incident, because failing to meet the obligations is enough.

How should a water utility report incidents?

A significant incident is reported in three steps via the S46 system to the competent CSIRT. First, an early warning within 24 h, then a notification within 72 h and finally a final report within one month. If the incident concerns customer data, a parallel 72-hour deadline for notifying the data protection authority (UODO) also applies.

What is a GRC system for water utilities, and are spreadsheets not enough?

A GRC system connects risks, policies, continuity plans, incidents, suppliers and tasks, as well as their owners, deadlines and change history. Spreadsheets, however, quickly go out of date, so they have to be collected manually before an audit. In BCMLogic Next, evidence is therefore created as you go, during everyday work.

Lite or full BCMLogic Next – which is right for a water utility?

Next Lite is enough for a company that wants to meet its NIS2 obligations without complex GRC processes, because it includes an industry package for water and wastewater. The full BCMLogic Next, on the other hand, is for organisations that also need business continuity management (BCM, BIA), custom processes or SSO. Moving between versions does not require data migration.

We already have documentation or ISO 27001. Do we need to start over?

No, because existing materials can be migrated to BCMLogic Next by your team, BCMLogic or a partner. The goal is therefore not to recreate documentation, but to keep risks, plans, actions and evidence in one system.

Next step